Kampala Flyover Project RAP Implementation, Uganda

In order to mitigate traffic congestion within the Greater Kampala Metropolitan Area (GKMA) many projects and studies have been carried out. Among them, JICA conducted the Preparatory Survey on the Greater Kampala Roads Improvement Project in 2013 and 2014.
Master Plan on Logistics in Northern Economic Corridor, Uganda

The objective of the Project was to formulate a Master Plan on Logistics for Northern Economic Corridor, along with integrated regional development strategy consistent with sub-regional development plans and national development plans, with 2030 as the target year.
Due Diligence and Engineering Review for Kampala – Entebbe Expressway, Uganda

The proposed Kampala – Entebbe Expressway project is a 4 – lane road of 51.4 kilometres comprising (i) an Expressway between Kampala and Entebbe International Airport; and (ii) a spur to the Munyonyo Resort. Physical works on the project o started in 2012.
Feasibility Study and Detailed Engineering Design for Kampala Southern Bypass, Uganda

Feasibility study, Traffic study, Route options analysis, Multi Criteria economic evaluation, Environmental and social consideration, Viaduct construction, toll plaza studies and layout designs, drainage design, Detailed design of 17 Km of the urban expressway.
Feasibility Study & Detailed Engineering Design for Kampala – Jinja Expressway, Uganda

Feasibility study, Traffic study, Route options analysis, Environmental and social consideration, twelve (12) Grade separated junctions, Resettlement action Plan, Detailed design of 76.8Km of the urban and rural motorway.
Design Review and Construction Supervision of Selected Infrastructure Sub-Projects in Gulu under USMID

Provision of the required pre-construction services aimed at ensuring a smooth project start, Establishment and application of effective start-up procedures and quality control of all aspects of construction, Review of the contractor’s proposed methodology and reinstating survey controls.
Design Review and Construction Supervision of Selected Infrastructure Sub-Projects in Kitgum under USMID

Provision of the required pre-construction services aimed at ensuring a smooth project start, Establishment and application of effective start-up procedures and quality control of all aspects of construction, Review of the contractor’s proposed methodology and reinstating survey controls.
Engineering Designs, Preparation of ESIA, RAP and Tender Assistance for Urban Infrastructure Investments.

Reviewing each Municipality‘s priority list of selected sub-projects to ensure rationality based on cost-benefit assessment, location (priority given to CBD and interconnectivity to USMID Phase 1 sub-projects and other national infrastructure), convenience (consideration to have limited displacement of people), environmental and social aspects
Detailed Engineering Design and Feasibility Study Reports for Puranga- Acholibur, Pajule-Pader and Nebbi-Goli

Review and update detailed engineering designs for Laropi Bridge and approach roads, including all necessary engineering investigations, plans, specifications, calculations, cost estimates, and reports, ensuring thorough survey and material documentation.
Technical Assistance of Preparatory Study for the Establishment of Research Development and Innovation Centre.

To conduct a gap analysis in order to propose the priorities and key focus areas for research by the department
To conduct a review of the existing human, financial and technological resources in the UNRA against the resources required to undertake research in the focus areas and make recommendations on bridging the capacity gap