As part of National Content (NC) commitments on the Tilenga Project - Upstream Facilities (TPUF), McDermott Uganda Ltd is committed to offering comprehensive training, capacity building, and skills-development programs to Ugandan professionals to enhance their ability to positively contribute to the ongoing development activities in the Oil and Gas sector. These will take the form of various capacity-building activities including online training programs that will be offered through various sub-contractors and suppliers.
Interested professionals are hereby encouraged to partake training opportunities that will be offered from time to time. Please refer to the link below for course details and express interest in any course of your choice.
Click the following link to register: REGISTER
Only applicants from Electrical Engineering, Mechanical/Industrial Engineering, structural Engineering, Civil Engineering, Environment Engineering & Management, and Pipe Testing Planning disciplines are eligible.
NB: Only successful applicants will be contacted
The general objectives for the trainings are;
The training programs will include:
Batch 1
Program | Date of Training | Deadline for Registration | |||
---|---|---|---|---|---|
Positive Displacement Pumps (Rotary) package. | 20th - 24th (March 2023) | 16th (March 2023) | HP & LP Separators (incl. Internals) & Electrostatic Coalescer Package. | To be confirmed | To be confirmed | Sand Treatment Package. | To be confirmed | To be confirmed | Lake Water Treatment and Deaeration Package. | To be confirmed | To be confirmed | Dry Transformers program. | To be confirmed | To be confirmed | HV Switchgear program. | To be confirmed | To be confirmed | HV Electrical Equipment (EACOP Interface) package. | To be confirmed | To be confirmed | Electrical Control System (ECS) package | To be confirmed | To be confirmed | AC and DC UPS Package. | To be confirmed | To be confirmed | Leak Detection Package. | To be confirmed | To be confirmed | HIPS System Package. | To be confirmed | To be confirmed |
Batch 2
Program | Date of Training | Deadline for Registration |
---|---|---|
Continuous Emissions Monitoring System (CEMS) program | To be confirmed | To be confirmed |
Machine Monitoring System package. | To be confirmed | To be confirmed |
Export Metering Package.. | To be confirmed | To be confirmed |
Oil Export & Water Injection Pumps package. | To be confirmed | To be confirmed |
Centrifugal Pumps (API 610) package. | To be confirmed | To be confirmed |
Centrifugal Pumps (ISO 5199) package. | To be confirmed | To be confirmed |
Diesel Firewater & Jockey Pumps project. | To be confirmed | To be confirmed |
Air Compressor & Dryer Package. | To be confirmed | To be confirmed |
Emergency Diesel Generator package. | To be confirmed | To be confirmed |
Batch 3
Program | Date of Training | Deadline for Registration |
---|---|---|
Diesel Dispensing Pump System package. | To be confirmed | To be confirmed |
Chemical Injection Packages. | To be confirmed | To be confirmed |
Nitrogen Package. | To be confirmed | To be confirmed |
Demineralised Water Package. | To be confirmed | To be confirmed |
Potable Water Package. | To be confirmed | To be confirmed |
Effluent Treatment Packages. | To be confirmed | To be confirmed |
Static Fire Fighting Equipment package | To be confirmed | To be confirmed |
HV Immersed Power Transformers & NER package. | To be confirmed | To be confirmed |
LV Switchgear & MCC package. | To be confirmed | To be confirmed |
Blowers package. | To be confirmed | To be confirmed |
Batch 4
Program | Date of Training | Deadline for Registration |
---|---|---|
Air Cooled Heat Exchangers package . | To be confirmed | To be confirmed |
Shell & Tube Heat Exchangers package. | To be confirmed | To be confirmed |
Plate & Frame Heat Exchangers package. | To be confirmed | To be confirmed |
Flare packages. | To be confirmed | To be confirmed |
Electric Heater packages. | To be confirmed | To be confirmed |
Vessels Packages. | To be confirmed | To be confirmed |
Analysers packages | To be confirmed | To be confirmed |
Power System Study program | To be confirmed | To be confirmed |
Lightning Study program | To be confirmed | To be confirmed |
Lighting Types & Environment Impact Reduction Survey Program | To be confirmed | To be confirmed |
HAZOP and Operability & SIL Reviews package | To be confirmed | To be confirmed |
Gas to Flare Composition Analyser program. | To be confirmed | To be confirmed |
Technological Risk Assessment Program. | To be confirmed | To be confirmed |
EMPT and Transient Voltage Recovery (TRV) Studies. | To be confirmed | To be confirmed |
© 2015 Infra Consulting Services Limited. All rights reserved.
UNITED KINGDOM
18 Skylark Way, Shinfield
Reading, RG2 9AJ
United Kingdom
UGANDA
3rd Floor, Parklane Courts
Plot 26, Nakasero Road
Kampala, Uganda
ETHIOPIA
Suite 804, 8th Floor,
DH Geda Building, Africa Road
Addis Ababa, Ethiopia