Design Review and Construction Supervision for; Kabembe – Kalagi – Naggalama towns and Namulonge – Kiwenda towns Piped Water Supply Schemes.

Complete

Client:

Ministry Of Water & Environment Uganda
Consultants::
Hankuk Engineering Consultants, Kyongdong Engineering Co. Ltd, ICS Engineering & Environment Ltd, Hydraulic and Sanitation Consult Ltd

Appointment Date:

2017
Design Review and Construction Supervision for; Kabembe – Kalagi – Naggalama towns and Namulonge – Kiwenda towns Piped Water Supply Schemes.

Key facts:
Provision of safe water, hygiene sanitation, Water supply and sanitation infrastructure.

Project Background:
Adequate water supply and sanitation infrastructure remains achallenge for Uganda’s long term sustainable socio-economic transformation with only 65% of the population in rural areas and 73% in urban areas having access to safe water.

The Water Sanitation Development Facility(WSDF) framework with the support of the Ministry of Water and Environment planned to undertake implementation of the Identified Strategic Small Towns Water supply and Sanitation projects through feasibility studies, Engineering detailed designs and construction supervision of the same.

Objective of the Project:
The overall objective of the project was to carry out design review and construction supervision of Kabembe-Kalagi-Nagalama, Namulonge-Kiwenda and Busiika-Bamunanika towns Piped Water Supply Systems. The three (3) key project subcomponents are:

  • Piped Water Supply Systems Design review
  • Construction supervision and;
  • Low key Systems performance monitoring during the defects Liability Period.

 

Scope of the Project:

The assignment consisted of two major components

  • Design review of Kabembe-Kalagi-Nagalama (Lot 3), Namulonge-Kiwenda (Lot 10) and Busiika- Bamunanika (Lot 7) Piped water supply systems, located in Mukono, Wakiso, and Luwero districts respectively.
  • Construction supervision of Kabembe-Kalagi- Nagalama (Lot 3), Namulonge-Kiwenda (Lot 10) and Busiika-Bamunanika (Lot 7) Piped water supply systems, located in Mukono, Wakiso, and Luwero districts respectively

 

Detailed Description of Actual Services Provided by ICS:

  • Feasibility Study review
  • Conduct detailed engineering surveys and designs for additional items/updates of the existing/reviewed design
  • Comprehensive review of the existing Environmental Impact Assessment studies.
  • Construction Supervision; Interpretation of the Technical specifications
  • Project management
  • Establish Quality assurance systems including verification of quality and source of materials and certification where applicable
  • Carry out periodic inspections of the Works during the Defect Liability Period.
  • Preparation of revised detailed hydraulic narrative engineering designs, technical specifications, bills of quantities, drawings and engineering cost estimates.
  • Preparation of reports; Inception report, Construction supervision progress reports.
  • Certify satisfactory completion of the works
  • Review the water resources both in quantity and quality for adequacy to meet the current and future demands.
  • Develop a Training Programme for Staff.
Read More

More Projects

Water Resource Management

Design Review and Construction Supervision for; Kabembe – Kalagi – Naggalama towns and Namulonge – Kiwenda towns Piped Water Supply Schemes.

Environmental and Social Consideration

Landslide Management Projects, Uganda

Highways and Transportation

Kampala Flyover Project RAP Implementation, Uganda

Highways and Transportation

Master Plan on Logistics in Northern Economic Corridor, Uganda