Feasibility Study and Detailed Engineering Design of 6 Selected National Roads, LOT 3: – Gulu-Opit- Rackoko Road (91km)

Ongoing

Client:

UNRA
Consultants::
ICS Engineering

Appointment Date:

2023
Feasibility Study and Detailed Engineering Design of 6 Selected National Roads, LOT 3: - Gulu-Opit- Rackoko Road (91km)

Detailed Description of Actual Services Provided by ICS

  • Carry out a feasibility study of upgrading the selected route, including consideration of alternative routes and pavement options, road safety, preliminary design, implementation plan or schedule, and economic and financial analysis;
  • Prepare a detailed engineering design for the selected route option, including all data collection, field surveys, and analysis to cover all aspects of the detailed design. The design shall be complete, covering aspects such as roadways, road signage, and other related furniture.
  • Prepare bidding documents for implementation of the works based on the approved detailed designs for the road upgrading works. These documents should be suitable for international competitive bidding and, if necessary, in compliance with the procedures of UNRA’s Development Partners regarding the procurement of works;
  • Prepare a full Environmental and Social Impact Statement (ESIS) and Environmental and Social Management Plans (ESMP) in accordance with the National Environmental Management Authority guidelines, Environment, Social Health, and Safety Management Systems, and other applicable international safeguards standards.
  • Prepare a Resettlement Action Plan (RAP) in accordance with government institutional, legal, and policy frameworks and international safeguards standards, and develop a Stakeholder Engagement Plan (SEP).
  • Execute all engineering, environmental, social, economic, and financial analysis and related services described in the technical requirements to support the achievement of the defined project objectives, taking into account the requirements of the Government of Uganda.
Read More

More Projects

Water Resource Management

Design Review and Construction Supervision for; Kabembe – Kalagi – Naggalama towns and Namulonge – Kiwenda towns Piped Water Supply Schemes.

Environmental and Social Consideration

Landslide Management Projects, Uganda

Highways and Transportation

Kampala Flyover Project RAP Implementation, Uganda

Highways and Transportation

Master Plan on Logistics in Northern Economic Corridor, Uganda